|
About the project:
Completed in 1980, the star-shaped chamber of the world-renown Crystal Cathedral features a glass-paneled exterior held in place by an intricate steel lattice. Entertainment Engineering, Inc. modeled the distinctive structure as part of a Facility Impact Report, becoming the first engineering firm to do so. The RISA-3D model included 26,000 members.
|
|